Local plan scoping consultation
Search representations
Results for Turley search
New search New searchComment
Local plan scoping consultation
Affordable housing
Representation ID: 6508
Received: 01/09/2026
Respondent: Turley
Tatton Estate supports an ambitious but deliverable affordable housing policy consistent with national planning policy. It argues that affordable housing should be integrated throughout developments rather than concentrated in specific areas, helping to create mixed and balanced communities. The respondent also emphasises the importance of clear phasing arrangements to ensure affordable homes are delivered and occupied alongside market housing. Tatton Estate states that its development proposals are based on mixed-tenure communities and compliance with applicable affordable housing requirements. It further contends that the ability of sites to deliver meaningful levels of affordable housing should be an important consideration when assessing and selecting sites for allocation.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Housing mix
Representation ID: 6509
Received: 01/09/2026
Respondent: Turley
The respondent supports housing policies that reflect changing demographic needs, including ageing populations, affordability challenges and varying household sizes. They advocate for larger developments to provide a mix of dwelling sizes, tenures and housing types, including accessible and adaptable homes. The response emphasises the importance of enabling residents to remain within their communities throughout different life stages, with smaller and specialist housing helping older people downsize locally. Housing mix should be planned alongside access to local services, public transport, healthcare and green spaces to support sustainable, mixed and intergenerational communities.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Self-build and custom-build housing
Representation ID: 6510
Received: 01/09/2026
Respondent: Turley
Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Housing diversification and providing for small and medium sized sites
Representation ID: 6511
Received: 01/09/2026
Respondent: Turley
The respondent supports a range of site sizes to meet housing needs, recognising that small and medium sites can increase housing choice and support village renewal. However, they argue that such sites alone cannot deliver the borough’s full housing requirement or necessary strategic infrastructure. The response advocates allocating larger, comprehensively planned developments capable of providing schools, healthcare, public transport, employment opportunities, utilities and green infrastructure. Tatton Estate highlights its land portfolio as an example of this balanced approach, with smaller-scale growth opportunities in villages and larger mixed-use developments in locations able to support significant infrastructure investment.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Employment and economy
Representation ID: 6512
Received: 01/09/2026
Respondent: Turley
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Town centres
Representation ID: 6513
Received: 01/09/2026
Respondent: Turley
Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Transport and infrastructure
Representation ID: 6514
Received: 01/09/2026
Respondent: Turley
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Health and wellbeing
Representation ID: 6515
Received: 01/09/2026
Respondent: Turley
Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles. These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Health and Health Inequalities
Representation ID: 6516
Received: 01/09/2026
Respondent: Turley
The Local Plan should address the less visible inequalities affecting rural areas, including housing affordability, limited public transport, access to healthcare and services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations. Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS
Attachments:
Comment
Local plan scoping consultation
Active Travel
Representation ID: 6517
Received: 01/09/2026
Respondent: Turley
Tatton Estate supports a connected, inclusive active travel network which serves existing and new residents and links homes to stations, schools, employment, local centres, community facilities and green space. Policies should address walking, wheeling, mobility scooters, adapted cycles and e-bikes and should require safe crossings, continuous routes, seating, wayfinding, cycle parking and long-term maintenance. The Estate's visions retain and enhance Public Rights of Way and propose links to the Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport improvements should be recognised in the Local Plan.
Cheshire East Local Plan Scoping Consultation
Representations of Tatton Estate
September 2026Contents
1. Introduction 1
2. Comments on the Local Plan Scoping Document 31
1. Introduction
Tatton Estate and context to this representation
1.1 This representation to the Cheshire East Local Plan scoping consultation is submitted to
Cheshire East Council on behalf of Tatton Estate.
1.2 Set in the heart of Cheshire, Tatton Estate is a forward-thinking and diverse rural estate
committed to shaping places that foster wellbeing, connectivity and long-term growth.
1.3 Located just ten minutes from Manchester Airport, thirty minutes from Manchester
city centre and forty-five minutes from Liverpool, Tatton Estate sits at the intersection
of countryside and regional opportunity.
1.4 Tatton Estate is a family-owned private estate, spanning more than 5,500 acres and
encompassing around 400 residential and commercial properties, villages, farms and
natural landscapes.
1.5 As a long-term steward of this land, Tatton Estate is committed to creating sustainable,
inclusive communities where homes, businesses, farming and nature thrive and exist in
balance.
1.6 Through responsible ownership and collaborative partnerships, Tatton Estate works to
create lasting value for communities while reinvesting in the infrastructure,
environment and places that sustain them.
1.7 Through its extensive landholdings, and its commitment to working collaboratively
with and having a lasting positive impact on the communities of which it is a part,
Tatton Estate is in a unique position in its ability to contribute to the development and
delivery of a progressive and sustainable Local Plan for Cheshire East and one which
optimises benefits for all.
The Tatton Villages: a model for rural regeneration
1.8 This representation is made in the context of the Tatton Estate’s recent submission to
the Local Plan ‘call for sites’ exercise (March 2026) through which it submitted eight
sites for consideration as development allocations through the Local Plan.
1.9 Whilst the call for sites submission includes sites that are proposed for development,
Tatton Estate’s vision and aspirations for the villages in which these sites are located
goes significantly beyond the provision of new homes, rather working together these
proposals are a vehicle to deliver a new and sustainable future for the ‘Tatton Villages’.
1.10 Tatton Villages is an Estate-wide commitment to reconnect and reinvigorate Tatton’s
towns and villages. By investing in schools, shops, meeting places, green spaces and
local services, Tatton Estate aims to strengthen everyday life across the local rural
network. Its vision is shaped around existing towns and villages; Knutsford, Mobberley,
Ashley, Rostherne, Millington and Bucklow Hill, set within 5,500 acres of land in North
Cheshire, surrounding but not including Tatton Park.2
1.11 Reflected in its proposals, growth within the villages would be distributed, landscapeled and tied to delivery of local facilities and infrastructure. Through this model Tatton
Estate is strengthening life in local places, communities and villages; renewing them
carefully so they grow and thrive rather than slowly losing their vitality.
1.12 This proposition sees the villages working together to distribute the benefit of
infrastructure investment across a shared geography. To that end, Tatton Villages is not
a single, large, edge-of-settlement expansion. It represents a coordinated approach to
village renewal focusing on well-designed sites in and around established towns and
villages, brought forward transparently within a coordinated framework and supported
by infrastructure investments that will benefit existing and future communities within
the area.
1.13 The new NPPF sets out the need for a positive approach to achieving a sustainable
future for rural settlements (see Policy HO6) and supports their managed growth to
enhance the vitality of rural communities and enable villages to grow and thrive,
especially where this will support local services. Tatton Villages is a practical, placebased embodiment of that. Through a holistic, multi-village approach, it creates an
opportunity to demonstrate what exemplary growth can look like in achieving a
sustainable future for this unique part of Cheshire.
Why villages need a new model
1.14 Across the UK, between 12,000 and 15,000 villages form the backbone of rural life, yet
the infrastructure that underpins daily village life has gradually weakened: local
services thin, younger households struggle to stay, older residents lose nearby
facilities, public transport reduces and community life becomes harder to sustain.
1.15 The villages are not broken. They are out of balance. Tatton Villages is Tatton Estate’s
long-term commitment to restoring that balance.
1.16 Homes are central to renewal because viable services require viable populations.
Housing is therefore not an end in itself but a catalyst for sustaining schools, meeting
places, shops, sport, green space and everyday social life.
1.17 Against this backdrop, Tatton Estate’s submission to the call for sites consultation set
out its proposals for eight locations. These articulate Tatton Estate’s ambition to put
these villages individually and collectively on to a more sustainable footing whilst
responding positively to the meeting the strategic development needs of Cheshire East
in a way which maximises local economic, environmental and social benefit.
1.18 These representations to the Local Plan are made in the context of this proposal.3
2. Comments on the Local Plan Scoping
Document
2.1 Tatton Estate welcomes the opportunity to provide its comments on the Local Plan
Scoping Document (LPSD) in the context of its proposals and land interests in Cheshire
East which are summarised above.
2.2 Comments are provided in response to each heading / subheading where relevant.
Summaries are provided where responses are more than 100 words long as requested
by the Council.
LPSD Section 2: New Local Plan
Why prepare a new local plan
2.3 Tatton Estate welcomes the preparation of an up-to-date Local Plan. It supports the
Council’s recognition that the starting point for determining the level housing
development which the Local Plan needs to make provision for is the Government’s
standard methodology, equating to 2,530 homes per annum. This scale of need
requires a balanced portfolio of deliverable sites, including strategic and smaller
allocations and urban and rural opportunities.
2.4 Housing should be planned as part of complete places. Site allocations should establish
clear requirements for transport, education, healthcare, utilities, green infrastructure,
affordable housing and community facilities. The Council should assess the net
improvement a proposal can deliver, including whether development can make an
existing settlement more sustainable, rather than treating the current absence of
services as a permanent constraint.
LPSD Section 3: Context for the New Local Plan
Increase in housing requirement
2.5 The National Planning Policy Framework (NPPF) published on 17th August 2026 is clear
that Local Authorities are expected to meet, as a minimum, the standard method
calculation for housing need. For Cheshire East this will, as the LPSD acknowledges,
represent a significant increase on the adopted housing requirement.
2.6 This uplift reflects the sustained need and demand for housing across the Borough.
This is illustrated by the comparatively strong rates of completions of housing following
the adoption of the current Local Plan, which whilst positive, have continued to fall
short of the full need for housing, as evidenced by sustained affordability issues and
growing numbers of households on the authority waiting list.
2.7 The NPPF continues to expect authorities to test whether the minimum need is
representative or whether a higher requirement is justified with Council correctly
recognising (at paragraph 3.7 of the LPSD) that the final housing requirement could be
higher.4
2.8 A proper reflection on the scrutiny of the housing requirement through the
examination of the adopted Local Plan, and specifically the evidential justification for
elevating the requirement to demonstrate alignment with planned economic growth, is
an important consideration for the evidencing of need, even in the context of the
standard method.
2.9 It is noted, in this context, that the LPSD acknowledges that, with reference to jobs
growth, the adopted Local Plan has seen average annual growth of 1.3%, significantly
exceeding the target prescribed in the Plan of 0.7% per annum (paragraph 5.68 of the
LPSD). The likelihood of this was consistently expressed by many representors at the
previous Local Plan Examination and it is reasonable to assume this level of growth will
be sustained and indeed exceeded recognising the economic assets in the authority
and anticipated infrastructure investment associated with Northern Powerhouse Rail
(NPR) for example.
2.10 It is therefore important that in progressing the informing evidence base that this
success and future investment potential is acknowledged and a positive approach
taken to sustain growth over the next plan period. This aligns with the Government’s
vision, as articulated through the National Industrial Strategy.
2.11 In providing for the homes and employment land that is required, it is critical that the
Local Plan acknowledges the sustained existence of different functional market areas
within the Borough. This recognises the size of the Borough and the relationships that
settlements in the north and south have with respective proximate larger economic
centres.
2.12 Of particularly note, settlements in the north of the Borough (loosely defined as the
previous Macclesfield district administrative area) are strongly related to the south
Greater Manchester housing market as a result of strong commuting links by road and
rail. This has historically driven high demand for housing and commercial floorspace in
this market area within the Borough. The challenge of supply keeping pace with
demand has continued to create challenging affordability pressures for local
communities.
Summary and implications
The Local Plan should, in accordance with national policy (NPPF Policy HO2) and guidance,
test whether a higher housing requirement than that calculated under the standard method
is justified to reflect growth ambitions linked to economic development or infrastructure
investment. This must take full account of the implications of planned infrastructure
investment through NPR and related local and sub-regional economic strategies.
The Local Plan must acknowledge different market geographies in the Borough in providing
for housing and employment needs. The planned provision of development in the northern
market area must respond to strong demands arising from the strong relationship with the
southern Greater Manchester Market and a strong local economy.5
Changes to Green Belt policy
2.13 The LPSD identifies and seeks to summarise changes to national planning policy in
relation to Green Belt since the existing Local Plan was produced and adopted.
2.14 The following points are highlighted at this stage as relevant to the onward
development of the Local Plan in the context of the recently published NPPF.
2.15 Paragraph 2 of Policy GB3 of the NPPF confirms that exceptional reasons to amend
Green Belt boundaries through a Local Plan include where a Local Authority cannot
otherwise meet its development needs in full having considered the full potential of
non-Green Belt sites for this purpose.
2.16 The consideration of alternatives to the use of Green Belt land includes assessing
whether suitable sites to meet the development need exist outside of the Green Belt
(Policy GB3 paragraph 2c).
2.17 In this context, suitable is a relative term. A proper consideration of whether
development needs can be met without reliance on Green Belt is not simply a question
of whether there is, theoretically, sufficient land for this purpose but rather the context
to that land is an important consideration in determining its suitability as an alternative
to Green Belt release. For example, does sufficient non-Green Belt land exist in the
right locations, according to the intended spatial strategy, what are the land’s
accessibility characteristics, is it located where needs exist and is the land able to
support the requisite infrastructure improvements to accommodate development?
2.18 Through Policy GB3, NPPF effectively requires a consideration of such matters in
determining how much Green Belt land is needed to meet development needs and
where. For clarity, it directs plan making authorities away from a process of exhausting
all non-Green Belt opportunities, irrespective of their context, and then proceeding
with the absolute minimum level of Green Belt release required to deliver a numerical
development requirement. Instead, it requires a consideration of the suitability, and
sustainability of sites (considered in the round), to meet development needs in a
manner which accords with the objectives of the Local Plan and the achievement of
most sustainable outcomes. This principle is further clarified through Policy GB4d. An
appropriate site appraisal methodology will need to be developed to reflect this
approach.
2.19 Policy GB3 also directs plan making authorities to identify suitable land around wellconnected stations for development and that where a development plan’s spatial
strategy does this, exceptional circumstances do not need to be used to justify changes
to Green Belt boundaries. Cheshire East has several well-connected stations and
stations where, through planned investment, the frequency of services to station can
increase a locations connectivity.
2.20 The LPSD notes that if there is need to release land from the Green Belt to meet
development needs, grey belt land should be considered first. In accordance with
Policy GB4 of the NPPF this sequential approach should be applied where ‘… this
promotes a sustainable pattern of development overall.’6
2.21 This is to say that the sequential approach to the release of Green Belt sites must be
applied in the context of the need to achieve a sustainable pattern of development
overall. Thus, consistent with the point made above, when considering Green Belt
sites, the land’s broader attributes need to be considered in determining its suitability
for allocation, not just its grey belt credentials. A site’s status as grey belt does not
override all other considerations in selecting sites from the Green Belt for allocation.
Overweighting of a site’s grey belt situation, in a consideration of candidate Green Belt
releases, should therefore be avoided as directed by NPPF Policies GB2 and GB4.
2.22 It is important that the approach to the identification, filtering and assessment of sites
for allocation is based on a methodology which reflects the direction provided by NPPF
policies GB2, GB3 and GB4 in this regard.
Summary and implications
In accordance with NPPF Policies GB2, GB3 and GB4, the appraisal and selection of sites for
allocation must have regard to the need to achieve a sustainable pattern and distribution of
development in overall terms and to the need to select sites which best achieve this beyond
just a consideration of Green Belt status and contribution. The sequential approach to site
selection must be carried out in this context. Whilst Green Belt is a critical consideration, an
overweighting of the Green Belt status of sites must be avoided in the context of NPPF in
order that the most sustainable sites, which collectively deliver the intended spatial
strategy, are selected for allocation.
Economic growth
2.23 It is agreed that the Local Plan must provide for more than just the quantified need for
employment land and ensure that the needs of different facets of the modern
economy are provided for.
2.24 Within the LPSD, the Council highlights that the strong job growth has been achieved
where there remains a healthy supply of employment land (375 ha, paragraph 5.68).
Whilst in quantitative terms this appears significant, it is strongly recommended that
the evidence base thoroughly re-assesses the suitability, and in particular the market
attractiveness, of this supply of land as to the extent to which it meets the needs of key
sectors and the needs of the modern economy as documented in NPPF Policy E1.
2.25 It is observed in this regard, for example, that the supply of remaining land along
strategic road corridors (the M6 and M56) in the northern part of the authority in
particular is comparatively modest in the scale of recognised elevated demand and
NPPF’s recognition of the specific locational requirements of the freight and logistics
sector (Policy E3). This must take adequate consideration of the economic advantages
the authority has on the basis of its proximity to large populations and areas of
economic activity in Greater Manchester and Merseyside linked by this road network.
2.26 Recognising the datedness of the adopted Local Plan and its evidence, it is critical that
account is given to the emerging demands and market signals arising from digital
infrastructure, data centres and gigafactories in the authority, again recognising its
connectivity, existing digital clusters within the authority and in close proximity to7
Greater Manchester, for example. The emergence of a need for data centres since the
last Local Plan in particular should be directly considered within the evidence base and
will necessitate a specific policy response within the Local Plan.
2.27 There is a requirement for the Local Plan to recognise and provide for rural business
development in accordance with NPPF Policy E4. This recognises that the rural
economy is a significant contributor to the Borough’s economic success.
2.28 Rural settlements in the north of the Borough have demonstrated that rural and village
locations can support start-ups, hybrid working, local services, advanced
manufacturing, research and development and flexible workspace where they are well
connected or can be made sustainable. The co-location of homes, employment, active
travel, green infrastructure and improved public transport through the planned growth
of current rural settlements in the Borough would reduce the need for longer car
journeys and strengthen local labour markets.
Summary and implications
It is recommended that the Local Plan identifies new allocations to provide for specific
sectors of the modern economy which have seen elevated demand and/or have newly
emerged since the adopted Local Plan was prepared based on an up to date evidence base
which thoroughly re-assesses the suitability, and in particular the market attractiveness, of
the existing supply of employment land in the context of a modern economy and economic
growth opportunities which the Borough benefits from.
It is recommended that the Local Plan explicitly recognises data centres as a key component
of the modern economy in Cheshire East and allocates strategic employment sites to meet
identified needs.
The Local Plan will need to recognise and provide for the development of the rural economy
and businesses within it in accordance with NPPF Policy E4.
Spatial Development Strategy
2.29 There is a need to progress the Local Plan without delay, notwithstanding the pending
preparation of the SDS. As such, the Local Plan will need to allow for circumstances
where the SDS, as a strategic policy document sitting ‘above’ the Local Plan, identifies
and sets out strategic development needs which the Local Plan does not reflect.
2.30 This can be managed through the Local Plan acknowledging the relationship between it
and the SDS and the potential requirement for an early review of the Local Plan to
ensure any misalignment is addressed given the role of a Local Plan as a key delivery
vehicle for the SDS.
2.31 The Tatton Villages proposition provides a corridor-based growth opportunity which
should be considered in both strategies. It links existing settlements and stations with
Tatton Park, Manchester Airport, Knutsford and Greater Manchester and can provide a
coherent basis for planned investment rather than isolated piecemeal developments
without a joined-up strategy for delivering local infrastructure improvements.8
Summary and implications
The Local Plan will need to acknowledge the relationship between it and the emerging SDS
and the potential requirement for an early review to accommodate the SDS.
The Tatton Villages proposition is a strategic, cross-boundary concept requiring
consideration and positive planning for across multiple plan areas, including both the
Cheshire East Local Plan and the SDS to ensure proper planning and delivery of
infrastructure.
Strategic environment assessment
2.32 Tatton Estate supports an integrated assessment of environmental, social, economic,
health and equality effects. Reasonable alternatives should be assessed consistently
and at an appropriate level of detail through the SEA process. In this regard, the
assessment must consider both adverse effects and the capacity of development to
deliver net improvements, including affordable housing, services, employment, public
transport, active travel, accessible green space, habitat creation, sustainable drainage
and heritage enhancement.
2.33 The assessment should also consider cumulative and corridor-wide outcomes. A
coordinated group of allocations under single long-term ownership may deliver
infrastructure and environmental networks that would not be achievable through
fragmented sites assessed in isolation. The SEA must deploy a methodology which
allows such matters to be taken into account.
LPSD Section 4: Baseline information and spatial portrait
2.34 The Local Plan spatial portrait should identify the distinct role of northern Cheshire East
and its functional relationship with Greater Manchester. This area contains strong
strategic assets including the M56, Manchester Airport, the Mid-Cheshire Line,
Knutsford and Tatton Park. It also contains rural settlements where limited growth and
declining services have reduced sustainability over time. These opportunities and
challenges should inform the spatial strategy and evidence base.
Cheshire East in a national context
Size, geographical location and population distribution
2.35 Cheshire East should not be assessed as a self-contained housing or economic market.
The northern part of the Borough has strong cross-boundary relationships with
Trafford and the wider Greater Manchester economy, while the Mid-Cheshire Line
connects communities across Cheshire West, Cheshire East and Greater Manchester.
Evidence on housing, employment, transport and infrastructure should reflect these
functional geographies and be prepared jointly where appropriate.
Connectivity
2.36 The LPSD notes the existing connectivity characteristics of the Borough, including links
into Greater Manchester to the north and international connections through
Manchester Airport. This connectivity means Cheshire East is, in economic and housing9
market terms, strongly linked to and influenced by Greater Manchester particularly,
with this being most acute in the north of the Borough which interfaces with areas of
high housing demand in south Manchester, whilst also being well connected to the city
centre.
2.37 Whilst this context is an influence on the new Local Plan, it is also important that the
Local Plan recognises and is informed by the future potential connectivity context to
the Borough, including Northern Powerhouse Rail (NPR) and potential tram/train links
between Altrincham, Hale and Manchester Airport via Ashley through an extension of
the Mid-Cheshire Line.
2.38 NPR particularly will have a strategic influence on the Borough’s connectivity with
surrounding settlements and areas of economic activity, impacting on movement
patterns and changing the dynamics of localised demand for homes and employment
space, its relationship with Greater Manchester, Manchester Airport and its
contribution to the economy of the northwest.
2.39 The influence of this future investment is an important consideration in the onward
development of the Local Plan including in respect of the scale of housing and
employment development needed and its distribution.
2.40 The connectivity portrait presented within the LPSD is too focused on motorways and
inter-city rail. It should also recognise the strategic role and unrealised capacity of the
Mid-Cheshire Line and its stations, including Ashley and Mobberley. The line connects
Chester, Northwich, Knutsford, Altrincham, Stockport and Manchester and provides
access to employment, education, services and visitor destinations.
2.41 The Local Plan should set an outcome of retaining the existing rail services as a
minimum and working towards at least two trains per hour in each direction,
supported by development-generated patronage, station access improvements and
coordinated investment. It should safeguard routes and land required for station
expansion, walking, cycling and interchange improvements. This would advance
policies TR1, TR3 and TR8 of the 2026 NPPF and benefit existing communities along the
whole corridor.
2.42 The portrait should also recognise Tatton Park as a major destination generating
substantial visitor movement through the Borough. Improved public transport and
active travel access to the wider Tatton area would support the visitor economy while
reducing pressure on the highway network.
2.43 In addition, there are planned active travel improvements, such as the Greater Bollin
Trail, that will enhance local connectivity for cyclists and pedestrians and the plan
should recognise and this and similar projects as part of the proposed transport
infrastructure investment.10
Summary and implications
The Local Plan should recognise both Cheshire East’s existing connectivity with Greater
Manchester and Manchester Airport and the transformative potential of future
infrastructure investment, including Northern Powerhouse Rail and enhanced rail and tramtrain connections along the Mid-Cheshire Line. These investments have the potential to
influence housing and employment demand, spatial distribution and sustainable travel
patterns across the Borough.
The Plan should also acknowledge the strategic role of the Mid-Cheshire Line, Tatton Park
and planned active travel improvements, ensuring that growth supports enhanced public
transport, walking and cycling connectivity whilst maximising wider economic, social and
environmental benefits.
The future Local Plan will need to be informed by and shaped around these strategic
investments which will influence development requirements and the spatial strategy which
the Local Plan will need to progress.
Economic contribution
2.44 The acknowledgement of Cheshire East’s economic success story must form a
fundamental foundation of the Local Plan.
2.45 Considerable time was taken up through the Examination of the adopted Local Plan on
the appropriate level of job growth which would be used to underpin the evidencing of
need for both employment and housing.
2.46 The LPSD itself acknowledges that the level of growth planned for - 0.7% growth in jobs
per annum - has been significantly exceeded. Indeed the authority has successfully
achieved average annual job growth of 1.3% (paragraph 5.68 of the LPSD).
2.47 There is every reason, in the context of national and local economic objectives, to
expect such a level of growth to be sustained over this plan period. The implications of
facilitating this to occur and the role of identifying sufficient land to accommodate
related business and population growth is a critical requirement of this plan and should
be approached positively in its preparation.
Summary and implications
The Local Plan should recognise and plan for the recent historic level of economic growth to
be maintained as a minimum. This is reflective of national planning policy and particularly
NPPF Policy E1 which advocates a proactive and opportunity focused strategic approach to
facilitating economic growth through the plan making system.11
Heritage, culture and natural environment
2.48 The spatial portrait should recognise Tatton Park's strategic importance as a visitor
destination receiving approximately 700,000 to 800,000 visitors in a typical year, as
recorded by the Council. The Local Plan should consider how housing, visitor
movement, sustainable transport, active travel, green infrastructure and the rural
economy interact across the wider Tatton area.
2.49 Tatton Estate supports a landscape-led approach which protects designated assets,
heritage settings, ancient woodland and high-value habitats while securing measurable
nature recovery and public access. Agricultural land should be assessed according to
quality, function and management rather than through a blanket assumption that all
countryside performs the same role. Coordinated growth can retain field patterns,
hedgerows and productive land, create connected habitats and support farming and
rural enterprise.
Summary and implications
The role and status of Tatton Park as a major visitor destination should be recognised in the
Local Plan spatial portrait alongside the potential for effective delivery of housing and
infrastructure interact with a growing and diverse economy which is protected and nurtured
as part of a bespoke strategy for this part of the Borough.
Cheshire East’s diversity
Settlements and rural-urban composition
2.50 The LPSD acknowledges that the Borough has a significant rural character with 18% of
residents living in rural areas, albeit also contains a number of larger towns.
2.51 Its rural character makes Cheshire East an attractive place to live and invest. However,
its rural context presents a number of challenges in securing a long-term sustainable
future for Cheshire East. Of note, the long-term viability and sustainability of a number
of the Borough’s rural settlements are under threat. Housing affordability, connectivity
by sustainable modes of transport and poor quality or unsustainable service provision
are common issues in the Borough’s rural settlements.
2.52 This context to the Borough’s rural settlements is an important consideration in the
onward development of the Local Plan. The Local Plan, and where appropriate
Neighbourhood Plans, provide an opportunity to respond positively to these threats
and put the Borough’s villages onto a more sustainable footing.
2.53 This requires a concerted focus on the steps which the Local Plan needs to take to
achieve this, including through supporting appropriate levels of growth in settlements
and seeking opportunities for an enhancement in service provision. A strategy which
directs almost all growth to towns risks reinforcing declining services, limited housing
choice, car dependency and demographic imbalance in villages.
2.54 This concept goes beyond historic approaches of seeing rural settlements as the least
sustainable locations for growth but rather towards acknowledging that they exist as12
existing concentrations of development, are a defining feature of the Borough’s
character and need to be allowed to evolve and change to achieve a sustainable future.
2.55 This principle is supported by NPPF Policy HO6 which supports the allocation of sites
for development in Local Plans ‘…which will support and enhance the vitality of rural
communities and enable villages to grow and thrive, especially where this will support
local services.’
2.56 A coordinated approach towards the managed growth of the Borough’s villages is
needed through the Local Plan. This should involve a recognition of their inter-related
nature (within defined geographies) where catchment areas for localised service
provision overlap and which can inform a multi-village strategic masterplan where a
coordinated growth plan, and service enhancement framework, can address some of
their existing sustainability threats in the spirit of NPPF Policy HO6.
2.57 The Council should assess villages individually and as connected clusters reflecting their
inter-reliance. The Tatton Villages proposition applies this principle through distinct but
connected roles for Ashley, Mobberley, Rostherne and Bucklow Hill, linked to
Knutsford and the Mid-Cheshire transport corridor.
Summary and implications
The Local Plan will need to take proactive steps to secure the long-term sustainability of the
Borough’s rural settlements, including fully engaging in a consideration of their current
status and long-term threats and what they need to thrive in a modern context. This will
require planned growth and management to deliver the services and infrastructure they
require. This includes a consideration of how villages interact in terms of service provision
and how, in this context, a multi-village approach across defined geographies can achieve a
more sustainable future for the Borough’s rural settlements.
Demographic mix
2.58 The age and demographic profile of the Borough has direct implications for the Local
Plan’s spatial strategy, housing mix and infrastructure policies and requirements. Of
note, the Local Plan should increase the supply of smaller, accessible and adaptable
homes, later-living accommodation, affordable homes and family housing in locations
with access to services and public transport. This would allow older residents to move
to suitable accommodation within their communities and release larger homes, while
enabling younger households and local workers to remain or return.
2.59 Housing mix should be linked to measurable demographic outcomes, including the
proportion of working-age residents, affordability, accessibility standards and access to
healthcare and community facilities. Tatton Estate's village visions provide for a broad
mix of tenures and typologies and, at Ashley, potential healthcare and school provision
located within a walkable local centre.13
Summary and implications
The demographic context to and needs of the Borough are an important influence on the
Local Plan. This goes beyond housing mix but informs the site selection process. The
Borough’s needs are diverse in respect of future housing provision and it is important that
the Local Plan engages in a proper consideration of what can be achieved in terms of
housing provision and supporting infrastructure in respect of individual sites to best respond
to this context.
LPSD Section 5: Scope of the new Local Plan
Local Plan period
2.60 Policy PM2 of the NPPF requires Local Plans to look beyond the specific defined plan
period stating that Local Plans should reflect ‘…longer term expectations extending
beyond the plan period where appropriate, including for any broad locations for growth
and regeneration identified in the spatial development strategy, and any specific
strategic site proposals’.
2.61 Clearly in the case of Cheshire East the Local Plan is intended to be adopted before the
first SDS for the region, and so won’t benefit from being informed by the SDS, however
PM2 is clear that a Local Plan should consider the period beyond the Local Plan’s stated
timeframe notwithstanding.
2.62 There is a practical imperative to this. Not least, the most sustainable strategy for the
future growth of the Borough may be to seek to allocate one or more new settlements
and major urban extensions, the full potential of which may not be realised over the 15
year plan period.
2.63 In this context, it may be appropriate for the Local Plan to allocate such sites reflective
of their delivery over 25+ years including on the basis of expected delivery beyond the
15 year plan period. The alternative of limiting the allocation to what is deliverable in
the plan period, with no provision for the years after, would result in such options not
being capable of performing favourably, when considered against alternatives, as the
numerical yield during the plan period only may indicate a scale of development which
is not reflective of a sustainable proposal (i.e. too small in the context of a new
settlement proposal) with the benefits as a sustainable option only becoming apparent
over the long term.
2.64 This shorter-term outlook is thus likely to result in a reliance on smaller scale,
piecemeal expansion of existing settlements, putting these under stress and pressure
without the benefit of a strategic plan for improved service provision which planning
for new settlements or large urban extensions provides.
2.65 Policy HO4 of NPPF supports longer term strategic planning in encouraging planning for
strategic scale sites which, by implication, will require the Local Plan to consider the
years beyond the plan period, notwithstanding its initial focus may be over only 15
years.14
2.66 Further, this longer term outlook is supported by Policy GB4 of NPPF which requires a
consideration of the need to allocate safeguarded land when undertaking a Green Belt
review for the purposes of minimising the need for a further Green Belt review when
coming to review the Local Plan.
2.67 Again, whilst not itself directing that a plan period should extend beyond 15 years, this
reinforces a need for the Local Plan to address some development requirements postplan period and make provision for these, where appropriate, in this plan. This is
important in enabling a seamless transition from the emerging Local Plan to the next
iteration and ensuring, in accordance with NPPF Policy PM2, the Local Plan is grounded
in longer term expectations and objectives.
Summary and implications
Whilst the plan period itself may be limited to 15 years, the strategic context to Cheshire
East and its significant development needs, will require a consideration of strategic-scale
sites and for the Local Plan to look considerably beyond this to effectively plan for the
Borough’s long-term growth.
In the absence of an SDS, and in the context of longer-term infrastructure investment and
the anticipated role of new settlements and strategic employment sites in accommodating
notably elevated requirements for housing and commercial floorspace, planning over a
longer plan-period will be of significant importance for the Local Plan.
Creating a vision and objectives
2.68 The vision should commit Cheshire East to meeting identified development needs
through well-designed, infrastructure-led and climate-resilient places which improve
outcomes for existing and future residents. It should recognise the complementary
roles of towns, villages and cross-boundary transport corridors in being able to support
growth requirements in a truly sustainable manner.
2.69 Measurable outcomes should include: delivery against housing need and the five-year
supply requirement; affordable, accessible and specialist housing; jobs and
employment floorspace; the proportion of homes with convenient access to daily
services; public transport frequency and station accessibility; walking, wheeling and
cycling connectivity; delivery of education, healthcare and community facilities;
publicly accessible green space; biodiversity and nature-recovery outcomes;
operational and embodied carbon; flood and water resilience; heritage outcomes;
infrastructure delivery against agreed triggers; and the demographic and geographic
reach of engagement.
2.70 We set out above in relation to section 4 of the LPSD two central issues which the Local
Plan will need to consider and which should be incorporated in the Plan’s vision and
objectives, these being:
• The need to take a proactive and positive approach to address the challenges
and issues faced by a number of rural settlements in Cheshire East and enable
a sustainable future for these communities with a focus on address15
affordability challenge and service accessibility and sustainability. The vision
should expressly reflect NPPF policy HO6 by supporting rural communities and
enabling villages to grow and thrive where this sustains or improves local
services.
• Shaping the Local Plan strategy around its future connectivity context,
including NPR and other planned investment, and the influence this will have
on the relationship of the northern part of the Borough with key economic
areas outside of Cheshire East and housing and employment development
markets and demand dynamics.
Summary and implications
A holistic vision and set of objectives will need to be defined which reflect the ambition to
achieve the Borough’s development needs but which recognise the opportunity to and
imperative of looking behind these to deliver and optimise social and environmental
outcomes. This will require a focus on accessibility, recreation, green infrastructure, the
needs of rural and other communities and achieving significant environmental gains. Further
the Local Plan will need to consider and plan for the Borough’s future context, including the
influence of NPR, which should be captured and reflected in its vision and objectives.
Planning for growth
2.71 The growth strategy should pursue economic, social and environmental objectives in
mutually supportive ways. Infrastructure capacity must not be treated only as a fixed
constraint: the assessment should identify what improvements are required, whether
development can fund or support them and how they can be phased. This is central to
the NPPF's vision-led approach.
2.72 The LPSD acknowledges the significant need for housing, calculated using the standard
method. However, it is critical that assembling the evidence to inform both the housing
and employment land requirement that the Council fully considers how the Plan will
sustain the strong economic success achieved to date. This accords with the NPPF (see
above including Policies E1 and HO2(3).
2.73 The Council, where evidenced, must include consideration of a housing requirement
which exceeds the minimum standard method and ensures that the proposed supply
of employment land will meet the needs of all segments of the local modern economy.
This aligns with the commitment articulated in the Cheshire East Plan to unlock
economic prosperity.
2.74 Tatton Estate's growth locations are predicated on improvement. They combine homes
with rail and bus opportunities, active travel, education and healthcare provision,
employment, public open space, biodiversity enhancement and community facilities.
Their single ownership provides a basis for comprehensive planning and coordinated
delivery rather than fragmented development.16
Summary and implications
Sustaining and exceeding historic economic growth should be a clear intent of the Local Plan
with growth options considered in the context of their ability to support this and to provide
the facilitating infrastructure needed for this purpose. The Local Plan should also consider
the need to plan for more housing than the standard methodology derived minimum and
the strategic influences, future changes and opportunities which may inform this.
Identifying and assessing sites
Housing and employment sites
2.75 We have set out above, in relation to Green Belt policy considered in section 3 of the
LPSD, the importance of a proper and correct application of national planning policy in
relation to Green Belt when identifying and appraising sites and particularly ensuring
that Green Belt characteristics are not overweighted in this process relative to other
sustainability criteria.
2.76 This is central to ensuring the most sustainable sites are selected for allocation, when
considered in the round, and that the outcome of the site selection process is reflective
of the intended spatial distribution of development, rather than this being an
uncontrolled consequence.
2.77 The latter is a common outcome where a narrow objective of minimising Green Belt
release at all costs and then limiting such releases to sites which make the least Green
Belt contribution is pursued. Such an approach would be at odds with the NPPF which
is clear that priority is given to non-Green Belt sites (and within the context of Green
Belt sites, to grey belt sites) only to the extent that this is compatible with achieving
the most sustainable outcomes when considered in the round.
2.78 We would raise two further points in relation to the site appraisal and selection
process at this stage:
1) It is important that sites are considered in the context of the development
proposal which are presented and achievable in each case. Whilst a
comparison of sites in their baseline (undeveloped) state is important to
ascertain basic sustainable characteristics, allocation selections should be
informed by what is achievable or proposed within a site, which may generate
different conclusions as to what represents the most sustainable allocation
options.
As an example, site size may have an influence on the ability to fund new
infrastructure provision (including on site provision) which may change the
conclusion of an assessment when considering one site over another.
Alternatively, a developer’s proposition may include specific additional onsite
benefits, such as new recreation facilities, which support the wider community
and which again should have an influence on how a site is scored (as long as
such commitments were to be incorporated into the allocation policy as a
specific requirement of the development).17
To this end, the site appraisal process will be required to be carried out at a
level of granularity which ensures critical points of difference, such as those
presented above, are able to be considered and weighted as appropriate in
the appraisal process. The alternative of a more crude appraisal process which
considers sites independently of such detail, may result in less sustainable
development proposals being selected for allocation.
2) In a similar vein, sites should be appraised in the context of what else is
being considered and potentially allocated locally. Sites can work together to,
for example, fund off site infrastructure improvements, but this can only be
revealed, as a form of mitigation or localised benefit, when the scenario of two
or more sites coming forward together is considered.
Again, and reflective of this, the site appraisal methodology needs to have a
sufficient degree of sophistication built into it to consider how outcomes, in
terms of a site’s performance, may change in different scenarios.
Summary and implications
A site assessment methodology will need to be adopted which is sufficiently detailed to
enable the most sustainable development options to be identified. This includes a
consideration of the development proposals which each site can and are proposed to
accommodate, not just the pre-development circumstances of the site, and a consideration
of how sites may work together to deliver, in combination, the infrastructure requirements
of a defined geography. Overweighting of Green Belt characteristics should be avoided with
a requirement to consider the sustainability of sites and proposals on a broader basis to
ensure the most sustainable sites, informed by a well-developed spatial strategy, are
selected for allocation.
Green Belt
2.79 Our comments in relation to the influence and application of Green Belt policy in the
assessment of candidate sites for allocation is set out above.
2.80 Tatton Estate supports the borough-wide Green Belt assessment and the sequential
approach in NPPF policy GB3. The assessment should follow Annex E, use sufficiently
small assessment areas and consider physical containment, settlement form and
transport corridors. It should identify grey belt without conflating Green Belt purpose
with separate landscape, heritage or ecological designations.
2.81 The Council should then assess whether potential releases would promote a
sustainable pattern of development, including the ability to deliver affordable housing,
necessary infrastructure and accessible green space under policy GB8. Land close to
existing settlements and the Mid-Cheshire Line should be evaluated alongside planned
service improvements and the capacity for comprehensive development. Tatton
Estate's evidence indicates that relevant parts of its promoted land may meet the grey
belt definition, but the Council should reach its own conclusion through the published
methodology.18
Summary and implications
Tatton Estate supports a Borough-wide Green Belt assessment in accordance with NPPF.
This should inform the selection of sites based on an appropriate methodology reflective of
NPPF. The relative benefits and sustainability of sites should be considered in the round with
Green Belt status and contribution being one informant of this, albeit wider considerations
in relation to site characteristics and benefits arising will be important to weigh
appropriately in the process.
Settlement hierarchy
2.82 Comments are provided in relation to the spatial distribution of development, at a
strategic level, below.
2.83 That issue has a interrelationship with the question of the settlement hierarchy. A
settlement hierarchy is typically a reflection of the current situation in relation to the
size and status of each settlement and the service provision within it. However it is
important that this is not used to prevent a proper consideration of spatial options,
and site selection which don’t directly reflect a baseline settlement hierarchy having
regard to existing infrastructure and scale.
2.84 To this end, a settlement hierarchy should not become a mechanism which locks
settlements into their present condition to determine future growth capacity. The
methodology should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an
allocation. It should assess access to services across connected groups of settlements
and recognise the role of public transport and active travel improvements.
2.85 The assumption that the hierarchy is fixed and the status quo should be maintained
should not be automatically carried forward for plan making purposes. In expanding on
this issue we would highlight three important points:
• There is a need to consider the spatial distribution of development at a
strategic level particularly in Cheshire East since, in broad terms, the northern
part of the Borough has a very different economic function to the south owing
to its relationship with and connectivity to Greater Manchester and future
planned infrastructure investment. This will have an influence on the question
of how much growth is directed towards the north versus the south, to some
degree irrespective of the size and status of existing settlements within these
two locations.
• Set against this context, Policy HO4 of the NPPF requires Local Plans to
consider the allocation of strategic sites, including new settlements, to meet
development needs. This reflects that such sites, often based on the principle
of pooling needs and meeting them in a smaller number of locations, may be
the most sustainable way of planning for an area’s growth. This provides the
advantage of achieving a critical mass of development in a single location19
where infrastructure can be properly planned and funded and where a diverse
range of housing options can be provided.
Commonly strategic sites represent holistically planned new communities,
albeit often representing a major expansion to a smaller existing settlement
which means some road and infrastructure networks are already in place to
build upon, supporting practical delivery (particularly in early years). Clearly in
such instances the development is going beyond meeting the needs of that
specific settlement and would involve a level of growth which wouldn’t
directly be supported through a narrow application of a settlement hierarchy
as a direct indicator of a settlement’s ability to accommodate growth in a
sustainable manner.
To this end, a settlement hierarchy must be seen in its context and should not
be used to inform a consideration of strategic scale sites which may be
assessed pursuant to Policy HO4 of the NPPF. Any settlement hierarchy which
is presented in the Local Plan should be reflective of the Local Plan’s strategy,
including intended development within that settlement. We would caution
against its narrow use in appraising the relative sustainability of various
development options for the reasons outlined.
• Finally, reflective of the points made above, it is important that the Local Plan
is based on a detailed consideration of what rural settlements need to achieve
a sustainable future. We set out above common threats affecting such
settlements, including in relation to affordability and service accessibility and
sustainability and, in this context, the principle of supporting their managed
growth, on a targeted and planned basis, to address these. This may support,
in some cases, a level of development which is greater than what has gone
before to address these sustainability threats.
Again, in this context we therefore would caution against a narrow use of a
settlement hierarchy in providing direction as to the level of development
which individual settlements should be permitted to accommodate. The
settlement hierarchy shouldn’t therefore be established as a limiting influence
in respect of planned growth targeted at putting each settlement on a more
sustainable footing through the Local Plan itself.
Summary and implications
A baseline settlement hierarchy should not be used as means of dictating the ability of
settlements to accommodate growth in a sustainable manner.
The Local Plan should consider both current sustainability and the realistic postdevelopment position where infrastructure and services are secured through an allocation.
It should assess access to services across connected groups of settlements and recognise the20
role of public transport and active travel improvements. This may justify allocating sites for
development which do not reflect a settlement’s current status in the hierarchy but reflects
that a settlement’s position in the hierarchy can evolve in the context of the delivery of the
Local Plan. The Local Plan exists to manage this change.
Spatial distribution
2.86 We agree with the proposition that a range of factors will need to be considered in
arriving at a proposed spatial distribution of development, both housing and
employment, across the district.
2.87 It is recommended that the Local Plan acknowledge evidence of the existence of
distinct housing market geographies. This is critical in the development of a spatial
distribution strategy and the progression of the apportionment of the requirement for
new homes and employment floorspace.
2.88 This must be underpinned by an appreciation of the drivers of need at a localised level
and the potential of settlements to sustainably plan for growth which responds to
evidenced needs. As we have identified this must recognise a forward-looking
settlement hierarchy that factors in the potential implications of investment in
infrastructure and is not just based on a current-day static position. This will ensure
that the Local Plan does not seek to displace needs and thereby constrain development
and economic growth potential.
2.89 We consider that factors relating to need, demand and planned infrastructure
investment should form a critical first gateway for apportioning the overall
requirement. This should be done prior to a consideration of potential supply
constraints, with this mitigating a risk that needs are not met where they arise in the
context of an appreciation of local market geographies.
2.90 A consideration of underlying information strongly affirms, for example, in this regard
that a significant proportion of need should be accommodated in the north of the
authority, i.e. broadly the former Macclesfield district. This recognises that:
• Circa 40% of stock across the borough is in this area (the former Macclesfield
district). Where existing stock forms the baseline for the standard method
calculation this is an important initial foundation from which to build. Using the
need for 2,530 homes per annum across the borough as referenced in the
scoping consultation (paragraph 3.4), simply apportioning on this basis would
suggest the need to provide for over 1,000 homes per annum in the northern
part of the borough.
• House prices in this area typically stand some 30% above the average for the
authority (2021 – 2025)1. Growth in house prices across many of the settlements
in the north of the authority has outpaced regional averages, creating worsening
affordability challenges for young people to remain close to family or to live in
proximity to employment. Analysis of 2024, house price data, for example
1 HM Land Registry (2024) Price paid data. Averages based on five years’ worth of sales21
showed that the postcode area of Knutsford (WA16) was the most expensive
place to buy a house in the North West, with the neighbouring postcode area
(WA15) – which covers Altrincham, Ashley, Hale, Hale Barns, Timperley and
Ringway - the next highest average.2 With comparative affordability the other
key component of the standard method calculation this would suggest that
proportionate provision should be elevated in this part of Cheshire East to
ensure affordability issues are proactively addressed.
• The area includes more than half of the jobs within Cheshire East (51%)3 but the
working-age population of this area has, despite proximity to significant
employment opportunities, slightly declined between 2011 – 2021. Recognising
the opportunity to sustainably accommodate jobs and homes again further
reinforces the importance of providing a higher level of homes in the northern
parts of the borough.
2.91 Tatton Estate strongly supports the Councils identification that a range of options in
the distribution of development should be considered to sustainably accommodate
needs and that this should include a distributed village-renewal option linked to public
transport and existing settlement networks. The above drivers of spatial need must,
however, form a critical early consideration in this process.
2.92 The LPSD is correct to acknowledge the scale of the borough and the diversity of its
towns and villages. It is similarly important to recognise the comparative role that
settlements have in the context of their communities, relationship with other
proximate settlements and importantly larger economic centres, including Greater
Manchester in the north and Stoke-on-Trent in the south.
2.93 These economic relationships, intrinsically linked to connectivity and proximity, mean
that not only is there a breadth of settlements across the authority but there are at
least two separate functioning Housing Market Areas (HMA). This was recognised
within the adopted Local Plan identifying ‘two functional sub-market areas’, with the
southern part of the administrative area ‘strongly linked to North Staffordshire and
Stoke-on-Trent’ unlike the northern part which is ‘closely linked with Greater
Manchester’4.
2.94 This was a conclusion of the Housing Development Study produced in 2015, which
sought inter alia to ‘identify functional housing markets’5. It reviewed a range of
indicators, many of which showed Cheshire East to be effectively split in two, with the
boundary between the two broad rental market areas (BRMAs) that cover Cheshire
East – shown at Figure 2.1 below – recommended as a suitable boundary between the
two HMAs6
2 https://www.business-live.co.uk/economic-development/most-expensive-place-buy-house-28335695
3 ONS (2024) Business Register and Employment Survey
4 Cheshire East Council (July 2017) Cheshire East Local Plan Strategy 2010-2030, paragraph 2.14
5 ORS (June 2015) Cheshire East Housing Development Study 2015, section 2
6
Ibid, paragraph 2.3022
Figure 2.1: Broad Rental Market Areas as the Basis of Local HMAs in Cheshire East
Source: ORS
2.95 As the evidence informing the adopted Local Plan was clear to acknowledge, the
northern parts of the authority have important functional relationships arising from
connectivity to southern parts of Greater Manchester. The commitment to update the
informing housing market evidence through the LPSD is supported and it is important
that this re-visits the operation of local housing markets within the authority where it is
anticipated that the distinct nature of the markets in the north and south are likely to
have further increased.
2.96 In this context it is noted that the current Planning Practice Guidance continues to
encourage analysis of migration flows, to determine ‘the extent to which people move
house within an area’7. The best available data, from the 2021 Census, shows a
relatively high containment of moves within the southern part of Cheshire East in
particular. Almost two thirds (64%) of those moving from an address in the area during
the year to March 2021 were still living in the southern part of Cheshire East at that
point. They were notably over 11 times more likely to be doing so than living in the
northern area, whose own movers were also around five times more likely to have
7
Ibid
Boundary of Cheshire East
South Cheshire BRMA
East Cheshire BRMA23
stayed in the area than relocated to the south. Destinations beyond Cheshire East also
differ, with those moving from the north more likely to settle in Greater Manchester
and those moving from the south generally favouring Cheshire West and Chester or
Newcastle-under-Lyme.
Figure 2.2: Containment of Moves from Northern and Southern Cheshire East
(2020-21)
Source: Census 2021; Turley analysis
2.97 The PPG also suggests that ‘contextual data such as travel to work areas’ can provide
‘information about the areas in which people move without changing other aspects of
their lives’8. The latest official Travel to Work Areas (TTWAs) – produced by the Office
for National Statistics – are still based on the 2011 Census, which was covered by the
Housing Development Study, but a more up-to-date position can be developed using
data from the 2021 Census. While this is unlikely to be fully representative, having
been undertaken during the COVID-19 pandemic when individuals were instructed to
work from home wherever possible, it is still considered to be of some value in offering
incomparable detail on commuting patterns.
2.98 It shows that some 63% of the working residents of southern Cheshire East travelled to
workplaces in the same area, around seven times as many as worked in the north (9%).
Fewer – circa 53% – of those living in the north also worked there, with others being
notably more likely to travel to Stockport or Manchester than to southern Cheshire
East.
8
Ibid
7,250
1,507
700 500 425
11,711
1,030 698 399 315
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Northern Cheshire East
Southern Cheshire East
Stockport
Manchester
Cheshire West and Chester
Southern Cheshire East
Northern Cheshire East
Cheshire West and Chester
Newcastle-under-Lyme
Liverpool
Movers from Northern Cheshire East Movers from Southern Cheshire East
Moving individuals
Destination of respective movers24
Figure 2.3: Variation in the Place of Work for Residents of Northern and Southern
Cheshire East (2021)
Source: Census 2021; Turley analysis
2.99 The need to acknowledge functional relationships with areas to the north also
recognises, in the context of the northern HMA, the continued growth and success of
Greater Manchester, and specifically economic hubs around Manchester Airport,
Stockport town centre and Manchester city centre have served to strengthen the
importance of a distinct housing market geography with existing settlements in the
northern part of the authority. This includes the larger settlements such as
Macclesfield and Knutsford but also smaller settlements in close proximity such as
Mobberley, Wilmslow and Handforth.
2.100 The scale of economic investment in proximity to these northern parts of the authority
is demonstrated, for example, by ongoing Manchester airport transformation
programme, which has seen circa £1.3bn spent on Terminal 2 and is estimated to
generate an additional 16,400 jobs by 2040. Furthermore, the employment
concentrated in this location is not limited to the airport alone, as the nearby Airport
City is identified as a key new economic asset attracting global occupiers and
investment within Places for Everyone9 (PfE). This has the potential to deliver 500,000
9
Places for Everyone Joint Development Plan Document for Bolton, Bury, Manchester, Oldham, Rochdale, Salford,
Tameside, Trafford and Wigan – 2022 to 2039 (adopted 21 March 2024)
1%
1%
3%
5%
1%
2%
7%
9%
63%
1%
4%
0%
1%
10%
10%
3%
53%
9%
0% 10% 20% 30% 40% 50% 60% 70%
Warrington
Trafford
Newcastle-under-Lyme
Stoke-on-Trent
Stockport
Manchester
Cheshire West and Chester
Northern Cheshire East
Southern Cheshire East
Proportion of working residents
Place of work
Residents of Northern Cheshire East Residents of Southern Cheshire East25
sqm of office, logistics, hotel and advanced manufacturing space, creating around
16,000 jobs in the next 10-15 years. Planned investment to enhance accessibility and
connectivity to the airport – including the extension of the Metrolink, development of
a new train station and Northern Powerhouse Rail (NPR) – will only serve to increase its
importance.
2.101 As we note above, the continued operation of separate and distinct local housing
market areas must be a consideration when developing a settlement hierarchy and
appreciating the current and future role and function of settlements.
2.102 Indeed, the adoption of a future or forward looking appreciation of comparative
settlements roles within a hierarchy will be of significant importance for this Local Plan.
Where it is agreed, as the Council has considered in its emerging evidence base to date,
that settlements should be categorised on the basis of comparative scale and existing
infrastructure it is important that this categorisation also takes into account their
future capacity to sustainably accommodate further development, including in
accordance with the intended distribution of development across Cheshire East at a
strategic level – e.g. a north-south split.
2.103 Future settlement capacity potential and this not being defined by the baseline, is also
reflected, for example, in the NPPF’s support for sustainable development in
settlements with comparatively strong rail access. Such an approach recognises the
potential of infrastructure investment to facilitate growth where settlements are
sustainably located within proximity of rail stations notwithstanding their existing size
and status in a hierarchy which reflects the baseline.
Summary and implications
The Local Plan’s spatial strategy should be informed by Cheshire East’s distinct housing
market areas, the distribution of housing and employment need, and the capacity of
settlements and strategic locations to sustainably accommodate growth including via
development-based investment in infrastructure. The underlying evidence supports
directing a significant proportion of growth to the north of the borough, reflecting
affordability pressures, economic activity and strong links to Greater Manchester.
The approach to a consideration of spatial distribution should also include options for the
growth and expansion of existing villages as a sustainable means of meeting the Borough’s
significant development needs and achieving their renewal and revitalisation.
Development in the Countryside
2.104 Local countryside policies should not duplicate national decision-making policies or
prevent plan-led allocations and sustainable village extensions. They should support
rural businesses, tourism, farming diversification, community facilities, active travel
and infrastructure where proposals are appropriately located and designed.
2.105 The distinction between unplanned isolated development and comprehensive growth
physically related to an existing settlement is important. The Tatton Villages
submissions are designed as extensions or renewal of existing communities, with26
infrastructure, landscape and movement frameworks and should be assessed through
the spatial strategy and allocation process rather than treated as isolated countryside
development.
Housing
2.106 The commitment to prepare a Housing Need Assessment (LPSD paragraph 5.31) is
strongly supported. It is critical that the authority understands the evidenced need for
different types and tenures of housing, including housing required to meet specific
needs.
2.107 In the context of a growing local economy, noting the LPSD’s reference to the authority
successfully achieving average annual job growth of 1.3% (paragraph 5.68), it is evident
there will be a significant and sustained need and demand for housing to
accommodate a growing workforce. This will include family-sized housing as well as
housing offering the opportunity for younger households to remain and re-locate into
the authority.
2.108 Evidence of the sustained need for larger family housing is apparent when looking at
the historic profile of the size of homes delivered within the authority. This shows a
sustained and growing provision of larger (3 and 4+ bedroom) homes, signifying a
strong demand for family-sized housing.
Figure 2.4: Size of home completed annually 2010 – 2025
Source: Cheshire East Annual Monitoring Reports
2.109 For comparable, context it is noted that in neighbouring Greater Manchester the
recently adopted Places for Everyone Plan (PfE), similarly recognises the demand for a
breadth of sizes of new homes. Whilst stating the importance of ensuring the delivery
of a diverse mix of values and tenures of new housing the PfE is clear highlight the
importance of attracting and retaining skilled workers to ensure the future
competitiveness of Greater Manchester to compete for investment. It confirms a key
aim to ‘boost the supply of well designed, adaptable new homes with appropriate
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
1-bed 2-bed 3-bed 4+ bed27
access to private space…to increase the options for skilled workers looking to move into
or within our area.’10
2.110 However, continued issues of affordability will also be an important consideration. The
evidence informing the adopted Plan identified a need for 1,401 affordable homes per
annum, with just over 60% of this need being for affordable (social) rented homes11. In
comparison to this need the delivery of affordable housing has fallen considerably
short, with affordable housing only accounting for circa 24% of all homes delivered
over the period 2020/21 to 2024/25 and equating to an average annual delivery of 581
affordable homes per year12.
2.111 The consequence of supply falling short of need is reflected in the fact that that on 31
March 2025 there were 7,847 households on the waiting list in Cheshire East13, with
this scale of need being relatively consistent over the last 10 years.
2.112 It is recommended that the Local Plan take full account of the evidenced breadth of
housing need in the distribution of housing and the typologies of sites identified to
meet needs. This should recognise the informing drivers of housing need as well as the
comparative viability of sites. In this context, for example it is important to understand
the geographic relationship between growing employment opportunities and the
comparative need for homes to meet the needs of working age households, including
families, as well as the capacity of greenfield (and potentially greenbelt) land to viably
support higher proportions of affordable housing in the stronger market areas of the
authority.
Summary and implications
The preparation of a robust Housing Need Assessment is strongly supported to ensure that
the Local Plan responds to the full range of identified housing needs, including family
housing, affordable housing and homes to meet specific needs. In the context of sustained
economic growth and rising employment, there will be a continuing need for a broad mix of
housing, particularly larger family homes and housing that enables younger and working-age
households to live close to employment opportunities.
The Local Plan should also address longstanding affordability pressures, recognising the
significant shortfall in affordable housing delivery relative to identified need and the
persistently high levels of housing need across the Borough. Housing requirements should
therefore be distributed and planned in a way that reflects both economic growth and local
housing market needs, whilst making effective use of sites capable of delivering a wide
range of housing types and tenures, including affordable housing in the authority’s stronger
market areas.
10 Places for Everyone Plan (2024), paragraph 7.28
11
Cheshire East SHMA Update 2013, arc4, paragraphs 6.14 and 6.16
12 Cheshire East Annual Monitoring Report 2024/25, Table 11.21
13
It is noted that these figures exclude existing council tenants seeking a transfer, but include existing tenants of
other social housing providers seeking a transfer.28
Affordable Housing
2.113 Tatton Estate supports an ambitious but deliverable affordable housing policy aligned
with NPPF policies HO5 and GB8.
2.114 Affordable housing should be integrated throughout developments. Delivery and
occupation should be secured through clear phasing.
2.115 Tatton Estate's visions are based on mixed-tenure communities and compliance with
the applicable affordable housing policy. The ability of site’s to support the provision of
affordable housing should be given appropriate weight in considering site allocations.
Housing Mix
2.116 Policies relating to housing mix should respond to ageing, affordability and changing
household size while enabling mixed and intergenerational communities. Larger
allocations should include a range of dwelling sizes, tenures and typologies and should
provide accessible and adaptable homes consistent with NPPF policy HO5 and Building
Regulations M4(2) and M4(3) requirements.
2.117 The policy should support moving within a community over a lifetime. Smaller and
later-living homes can allow older residents to downsize locally, releasing larger homes,
while affordable and family housing can retain working-age households. Housing mix
should be considered with access to local centres, public transport, green space and
healthcare.
Self build and custom built housing
2.118 Tatton Estate supports an appropriate contribution to self-build and custom-build
demand within a diverse housing portfolio. Requirements should be based on robust
demand evidence, allow for serviced plots within larger allocations and include delivery
mechanisms which prevent plots remaining undeveloped and delaying wider
infrastructure.
Housing diversification and providing for small and medium sized sites
2.119 Tatton Estate supports a diverse portfolio of site sizes in accordance with NPPF policy
HO6. Small and medium sites can widen choice and support proportionate village
renewal, but they cannot alone meet the borough's housing need or deliver all
strategic infrastructure. The spatial strategy must also allocate larger, comprehensively
planned sites capable of supporting schools, healthcare, public transport, employment,
utilities and major green infrastructure.
2.120 The Estate's portfolio demonstrates this complementary approach: Rostherne,
Mobberley and Bucklow Hill offer smaller-scale village growth, while Ashley and
Knutsford can accommodate larger mixed-use propositions with more substantial
infrastructure investment.
Employment and the economy
2.121 As the LPSD correctly identifies, an Economic Development Needs Assessment and
Employment Land Review must form an important component of the evidence base.
This will need to establish the quantitative and qualitative need for employment land,
recognising as required by the NPPF different facets of the modern economy.29
2.122 It is noted that the scoping consultation references the residual supply of some 375 ha
of employment land across the borough. It is expected that the evidence base will
thoroughly consider the extent to which this supply is attractive to the market and can
accommodate the needs of different sectors of the market.
2.123 It is also important that, in accordance with a consideration of the spatial distribution
of provision, an understanding of the location of this supply in the context of spatial
drivers, economic changes and market dynamics is considered. For example, it is
observed that despite perceived high market demand in the northern parts of the
Borough for commercial development the Council’s monitoring report (2024/25)
suggests that take-up of employment land over the plan period to date has been very
low in the northern parts of the borough (circa 17 ha). This implies a potential shortfall
of market attractive land in this part of the borough.
Summary and implications
The preparation of an Employment Land Review is supported to ensure that future
employment land requirements reflect the needs of the modern economy. The evidence
should assess not only the quantity of land available but also its market attractiveness and
suitability for different sectors.
The Local Plan should also consider the geographic distribution of employment land,
particularly whether low take-up in the north of the borough reflects a shortage of
attractive and deliverable sites despite strong market demand.
Town Centres
2.124 Tatton Estate supports the town-centre-first approach, but the hierarchy should also
recognise local centres, village shops and community hubs which meet every day
needs, support the sustainability of settlements and reduce travel demand. New or
renewed facilities within planned village growth would complement, not compete
with, Knutsford and other town centres. Policies should allow proportionate facilities
where they support rural vitality, walkability and the 15-minute community principle.
Transport and infrastructure
2.125 The need for the Local Plan to consider the transport implications of the Local Plan and
present a strategy for meeting the wider infrastructure requirements associated with
the planned level of growth is recognised in the LPSD.
2.126 Transport should be used to shape the spatial strategy from the outset, in accordance
with NPPF policies TR1 and TR3. The Infrastructure Delivery Plan should not simply
identify highway mitigation after sites are selected. It should define outcomes for
mode share, accessibility and service provision and coordinate land use with rail, bus,
walking, wheeling and cycling investment and positively influence this.
2.127 The Mid-Cheshire Line should be treated as a strategic corridor. The Local Plan should
protect the current service as a minimum and establish a partnership objective of at
least two trains per hour in each direction, together with improved station access,
walking and cycling connections, interchange and passenger facilities. This requires
early engagement with Northern, Network Rail, the Combined Authority, Cheshire30
West and Chester, Trafford and Greater Manchester. Growth at Ashley and Mobberley
can increase the station catchments and patronage needed to support the case for
investment.
2.128 Rostherne and Bucklow Hill should be sought to be connected to Ashley, Mobberley,
Knutsford and wider services through an integrated bus proposition and active travel
network. Existing and proposed Public Rights of Way, the Sustrans Regional Cycle
Route and Greater Bollin Trail should form a connected movement framework,
including access towards Tatton Park.
2.129 Social and utility infrastructure must be planned in parallel. We have set out
throughout this representation that the ability of sites to individually or collectively
secure infrastructure improvements in order to accommodate development, ensure
this does not prejudice the ability of existing communities to access the infrastructure
and service they need and to achieve wider community benefit is an important
consideration in the selection of sites for allocation and indeed in consideration
strategic options for accommodating development. Allocations should set
requirements, costs, phasing triggers, delivery bodies and long-term management
arrangements in this regard.
2.130 Tatton Estate has presented its Tatton Villages proposal within the recent call for sites
submission which provides an opportunity for a collection of sites to work together to
provide new and improve existing infrastructure supporting rural communities in this
area of Cheshire East and in doing so ensuring growth can be accommodated in a
sustainable manner. This reflects many of the principles outlined above.
Summary and implications
The Local Plan should embed transport and infrastructure planning within its spatial
strategy from the outset, recognising the Mid-Cheshire Line as a key corridor for
sustainable growth and investment.
Site allocations should be supported by clear infrastructure delivery requirements, with
the Tatton Villages proposal demonstrating how coordinated growth can help secure
infrastructure improvements and support sustainable rural communities.
Health and Wellbeing
2.131 Natural capital and health should be treated as infrastructure. Site selection and
allocation policies should require connected green and blue infrastructure, accessible
open space, biodiversity net gain, nature recovery, sustainable drainage, active travel
and facilities which support social interaction and healthy lifestyles.
2.132 These measures should be secured through allocation requirements, phasing and longterm stewardship rather than left as discretionary design detail.
Health and Health inequalities
2.133 The Local Plan should address the less visible inequalities affecting rural areas,
including housing affordability, limited public transport, access to healthcare and31
services, social isolation and digital connectivity. Healthy-place policy should be
embedded in the spatial strategy and site allocations.
2.134 Tatton Estate's proposals seek to create mixed-tenure, intergenerational communities
with walkable access to green space and facilities. Potential provision includes
healthcare and new primary schools, community and recreational facilities, shops,
community halls, public house or restaurant, public open space and active travel
improvements all of which will enhance health outcomes in rural villages.
Active Travel
2.135 Tatton Estate supports a connected, inclusive active travel network which serves
existing and new residents and links homes to stations, schools, employment, local
centres, community facilities and green space. Policies should address walking,
wheeling, mobility scooters, adapted cycles and e-bikes and should require safe
crossings, continuous routes, seating, wayfinding, cycle parking and long-term
maintenance.
2.136 The Estate's visions retain and enhance Public Rights of Way and propose links to the
Sustrans Regional Cycle Route and Greater Bollin Trail. These planned transport
improvements should be recognised in the Local Plan.
Climate Change
2.137 Tatton Estate supports climate mitigation and adaptation being embedded in the
vision, spatial strategy, site selection and allocation requirements. Sustainable location,
mixed uses, public transport, active travel, compact form, low-energy buildings,
renewable technology, green infrastructure, carbon sequestration and long-term
stewardship should be assessed together.
Climate Change Adaption
Renewable and Low carbon energy
2.138 Tatton Estate supports policies for renewable and low-carbon energy which are
proportionate, design-led and compatible with landscape, heritage, ecology and grid
capacity. The village visions include on-site solar energy, heat pumps and flexible
energy opportunities. Strategic engagement with electricity network operators should
identify reinforcement requirements early and align them with renewable options for
energy generation, and growth phasing.
Recreation and community facilities
2.139 Tatton Estate strongly supports a specific rural community facilities policy. Current
service provision is partly a product of historic population and investment patterns.
Policy should recognise that planned housing growth can create the critical mass and
funding required to retain, restore or introduce community facilities and improve
public transport.
2.140 Flexible and co-located facilities should be encouraged so buildings can adapt to
changing needs.
Design
2.141 Tatton Estate supports:32
• Design coding in principle
• Strong design governance
• Clear placemaking expectations
• Masterplan-led growth
• Landscape-led development
• Long-term stewardship models
2.142 However, Tatton Estate does not support a highly detailed borough-wide design code
that seeks to prescribe development outcomes across every part of Cheshire East. The
Borough is simply too diverse for a single code to appropriately guide development
across the multitude of contexts in which development will need to be delivered which
present varying challenges, opportunities and design requirements and drivers. To
highlight this variety, these situations include:
• Strategic urban extensions
• New village growth
• Transport-oriented settlements
• Employment locations
• Rural communities
• Strategic infrastructure locations
• Green Belt release sites
2.143 A single code would either become so generic that it adds little value, or become so
prescriptive that it constrains good, contextually-responsive urban design and
placemaking.
2.144 The Council should ensure that future design codes remain focused on place-making
outcomes, rather than prescriptive architectural solutions or compliance-based coding.
Successful places are rarely characterised by rigid uniformity. Instead, they are defined
by strong landscape structure, well-connected movement networks, attractive public
realm, biodiversity, sustainability, health outcomes and local distinctiveness. Design
codes should therefore prioritise:
• Landscape structure and green infrastructure;
• Walkability and active travel;
• Character and local identity;
• Climate resilience;
• Biodiversity enhancement;
• Public realm quality;
• Community infrastructure; and
• Long-term stewardship.
2.145 The LPSD appears to assume that design coding is primarily a regulatory exercise.
Tatton Estate considers that coding has a more strategic and influential role than this
and can be used positively to optimise positive place making outcomes. Design coding
should therefore be viewed as a placemaking tool, not simply a development
management tool.
2.146 Tatton Estate has already laid the foundations of this approach through the articulation
of its Tatton Villages concept which goes significantly beyond meeting development
requirements but has the outcome of achieving better places as its absolute focus.33
2.147 An important underpinning component of Tatton Estate’s villages proposal is
responsible long-term stewardship. To this end, Tatton Estate sees placemaking as not
solely a function of physical design, but also depends upon ongoing management,
maintenance and investment in landscape, public realm and community infrastructure.
Future design coding should therefore recognise stewardship and management
arrangements as key components of successful place delivery.
2.148 The Tatton Villages Charter provides a consistent estate-wide standard while allowing
each settlement to remain distinct. Its vision for the estate is landscape-led and
structured around walkability, mixed uses, connected green infrastructure, local
character and community facilities. The Estate has also undertaken early community
engagement so local concerns and priorities can inform any later masterplanning if
sites progress.
2.149 Tatton Estate’s recommended approach to achieving effective place making through
design policy and standards is tiered.
a) Borough-wide Design Framework:
2.150 Prepared by Cheshire East and linked to national guidance. This would establish:
• Design objectives
• Climate resilience expectations
• Green infrastructure principles
• Active travel requirements
• Healthy place principles
• Design review processes
b) Settlement Frameworks:
2.151 Prepared for specific settlements/areas (e.g. Knutsford, Tatton Villages, Southern
Growth Corridor, Market Towns). This tier would establish:
• Character
• Growth objectives
• Settlement role (within hierarchy across Cheshire East)
• Strategic landscape structure
c) Site-specific coding:
2.152 Prepared alongside allocations, contributing to more detailed design coding. This tier
would determine:
• Street hierarchy and typologies
• Block structure
• Landscape character
• Public realm
• Building typologies
• Design safeguards (inc. long-term management and stewardship)
2.153 This strategic approach is one which the Local Plan should take forward as an
overarching framework for achieving better place making through design.34
Summary and implications
Tatton Estate support design coding in principle, strong design governance. clear
placemaking expectations, masterplan-led growth, landscape-led development and longterm stewardship models.
It would caution against adopting a rigid Borough-wide approach to design coding reflecting
the diversity of the Borough rather a focus on place-based results, which achieve optimum
social, environmental and economic outcomes, should be the focus of any approach to
design coding or a design framework. This should be responsive to and cognisant of
localised circumstances and variation across the Borough.
LPDS Section 6: Proposed Local Plan Engagement Strategy
2.154 Tatton Estate supports an Engagement Strategy which is timely, transparent, accessible
and capable of demonstrating how evidence and representations have influenced planmaking. Engagement should include residents, businesses, infrastructure providers,
operators, landowners, younger people and those whose housing needs are not
represented by current home ownership patterns.
Key Issues
2.155 Tatton Estate agrees that housing need, the five-year supply shortfall, Green Belt
review, infrastructure and the accelerated programme require early and focused
engagement. The August 2026 NPPF must now be reflected throughout the process.
2.156 The Council should prioritise engagement on the choices which will determine delivery:
the distribution of growth, strategic infrastructure, the role of rural communities, the
Mid-Cheshire Line, affordable housing, Green Belt assessment, site selection and
infrastructure phasing. This will help move debate from whether change occurs to
where and how it can produce the best outcomes.
Engagement Principles
2.157 Tatton Estate supports the engagement principles, particularly early, evidence-led and
partnership-based working. Infrastructure providers, transport operators and
promoters with control of deliverable land should be engaged early enough to test
options and delivery, while formal site assessment remains consistent and transparent.
2.158 Promoter-led community engagement should be recognised as complementary to the
statutory process. Tatton Estate has sought to provide current information, answer
questions and allow local priorities to influence its thinking before any planning
application stage and has proactively organised community consultation events to
discussion submissions to the call for sites exercise with local stakeholders and
residents reflective of its commitment to early and collaborative dialogue.35
Engaging methods
Engaging Site Promoters
2.159 Tatton Estate supports a transparent and consistent approach to site promoters.
Published protocols should allow proportionate technical engagement on evidence,
infrastructure and deliverability without creating preferential treatment. Records
should distinguish factual clarification from advocacy and should be included in the
engagement register where appropriate.
2.160 The Council should also maintain accurate public site records. Superseded or
withdrawn submissions should be labelled and mapped separately from current
promotions. This is essential to prevent public misunderstanding and to ensure
assessment is based on the promoter's current position. Tatton Estate remains willing
to provide technical evidence and coordinate engagement with infrastructure
providers within the published process.36
Turley Manchester
Transmission
6 Atherton Street
Manchester
M3 3GS