Local plan scoping consultation

Search representations

Results for Keep Greenside Green Residents Group search

New search New search

Comment

Local plan scoping consultation

Consultation documents

Representation ID: 1260

Received: 03/08/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

I request that the consultation period for the Local Plan Issues and Options Scoping Report be extended by at least two weeks.

Comment

Local plan scoping consultation

Identifying and assessing sites

Representation ID: 2848

Received: 20/08/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

CFS26 590, CFS26 460 & CFS26 557 – Sandy Lane / Birtles Road Historic Landfill & Potential Contamination

Attachments:

Comment

Local plan scoping consultation

Identifying and assessing sites

Representation ID: 6169

Received: 01/09/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

We object to progressing CFS26 590, land north of Birtles Road, because we believe its cumulative constraints make it unsuitable and undeliverable for housing. The site performs an important Green Belt function in preventing the outward sprawl of Macclesfield and lacks demonstrated safe and sustainable access. We are concerned about impacts on wildlife, ponds, hedgerows and ecological connectivity, alongside risks associated with the adjacent historic landfill and groundwater. Landscape, heritage, flooding, drainage, utilities and overhead power lines create further constraints. We believe these issues could substantially reduce realistic development capacity and should be fully investigated before the site progresses through the Local Plan process.

Comment

Local plan scoping consultation

Green Belt

Representation ID: 6213

Received: 01/09/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

1 - Brownfield First
Before considering further Green Belt release, the council should publish a proper assessment of
brownfield sites, vacant buildings, stalled permissions, town-centre regeneration opportunities and
underused public land. This should include a realistic assessment of what intervention would be
needed to make difficult sites deliverable.
The council should also reconsider its existing density expectations. "Build up, not out" as the
government had repeatedly said. Policy HOU 14 generally expects at least 30 homes per net hectare.
In light of the revised minimum housing need of 2,530 homes a year, or 37,950 over 15 years, the
new plan should test increasing this to at least 40 homes per hectare in Macclesfield and other
suitable locations.
Increasing density from 30 to 40 homes per hectare provides a third more homes on the same land
and reduces the land needed for a fixed number of homes by 25%. Applied purely as an illustration
to the 37,950-home requirement, this reduces the land requirement from around 1,265 hectares to
949 hectares, a difference of more than 300 hectares. Existing permissions, windfalls and brownfield
sites would reduce both figures, but the proportional saving remains the same. The council should
publish different density scenarios and show how much greenfield land each would require.
Where greenfield or Green Belt land is considered, the council must also look at gross density: how
many homes are delivered for every hectare of countryside lost. CFS26 590 is a clear example. Its
submission identifies a total site of 19.228 hectares, but only 13.6 hectares as developable, with
approximately 400 homes. This equates to 29.4 homes per net developable hectare but only 20.8
homes per hectare across the submitted site. This is poor return for the loss of green belt land that
has been farmed for centuries, has significant biodiversity benefits and is providing an important role
in stopping the sprawl of Macclesfield.
The promoter proposes large areas of open space, landscaped edges, biodiversity enhancements,
buffers around the overhead power lines and drainage measures such as SuDS. These may all be
necessary, but they also reduce the site’s housing yield. The council should not allow a heavily
constrained site to appear efficient simply by calculating density on the smaller area left.
Both gross and net density should be published for every potential allocation. Housing-only Green
Belt sites should be expected to deliver at least 30 homes per *gross* hectare. If that cannot be
achieved without compromising environmental protection, drainage, infrastructure or landscape
buffers, the site should be rejected in favour of a less constrained alternative.
We also want Cheshire East to undertake a feasibility study into building council housing directly and
this was mentioned multiple times in our residents meeting. This should audit land the council owns
or controls and examine whether higher-density council and social housing could be delivered
through direct development or partnerships with housing providers.
The Government’s new Council Housebuilding Support Fund specifically funds feasibility studies, site
identification and housing-pipeline development. Applications open in September 2026, with
councils able to seek up to £300,000 in each of three years. This can support bids to the £39 billion
Social and Affordable Homes Programme, which prioritises council housing and Social Rent.
Cheshire East owns large amounts of land across the region. Suitable parts of that land should be
included in the feasibility work, alongside other council-owned land in Macclesfield. A further 95.7
hectares at South West Macclesfield has already been safeguarded to meet longer-term
development needs. If Macclesfield’s boundary must expand, these established options should be
fully assessed before additional Green Belt sites with significant constraints.
Green Belt should not be released until these alternatives have been properly tested and the results
published.

Attachments:

Comment

Local plan scoping consultation

Strategic green gap

Representation ID: 6214

Received: 01/09/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

2 - Protect Gaps Between Settlements
The submissions around Macclesfield must be assessed together. Taken collectively, those around
Greenside could create a substantial new development front along Whirley Road, Sandy Lane, Birtles
Road and towards the A537.
The council’s previous Green Belt work found that parcels MF11, MF08 and MF09 made a significant
contribution to checking the unrestricted sprawl of Macclesfield. If a new assessment reaches a
different conclusion, the council should explain clearly what evidence has changed.
The revised grey-belt approach does not mean that all Green Belt is equally available for
development. Purpose A: checking the unrestricted sprawl of large built-up areas, is particularly
relevant here. Annex E of the revised NPPF specifically identifies an extended “finger” of
development into the Green Belt as an indicator that land may make a strong contribution to
preventing sprawl.
The council should not divide large Green Belt parcels into convenient smaller areas that disguise
their wider function or allow promoters to nibble away at long-established boundaries. Birtles Road
and Whirley Road have contained the outward spread of Macclesfield towards Prestbury and
Henbury and helped protect the Alderley Edge wooded landscape for many years.
Any new settlement boundary must be clear, permanent and capable of resisting further expansion
over the full plan period. None of the Greenside submissions provide an obvious defensible long
term boundary.

Attachments:

Comment

Local plan scoping consultation

Transport and infrastructure

Representation ID: 6215

Received: 01/09/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

3 - Infrastructure Before Growth
Infrastructure must be assessed cumulatively across all the Greenside proposals, not calculated
separately for each submission.
Whirley Primary School is already full. Ofsted records 212 pupils against a capacity of 210. Cheshire
East’s 2026 admissions figures show 31 children allocated against a Published Admission Number of
30, with the final allocation only 0.406 miles from the school. We also know of families living on the
Greenside estate, close to the school, who have failed to obtain a place.
The school occupies a tightly constrained site and there is no obvious land available for conventional
expansion. The council cannot assume that developer contributions would solve this. If sites around
Greenside progress to the next stage, the council should publish the school’s current and forecast
capacity and a feasibility study showing whether physical expansion is possible. If development at
this scale requires a new primary school, its location, funding and delivery programme must be
established before housing is allocated, with places available before homes are occupied.
Traffic must also be modelled cumulatively. The submissions would place further pressure on Whirley
Road, Birtles Road, Sandy Lane, Church Lane, Broken Cross and the A537. Several local approaches
are narrow or single track, have poor or missing pavements and contain chokepoints where widening
would be extremely difficult because of existing homes.
Previous council highways evidence treated Whirley Road as unsuitable for development access,
including excluding vehicular access from the LPS18 Weaver Green development. Any departure
from that position needs clear evidence, particularly as these roads are in a similar or worse
condition than when the previous Local Plan was prepared.
The same principle applies to drainage, sewerage, healthcare, public transport, electricity and safe
walking and cycling routes. Promises of future contributions are not enough. The council must show
that improvements are physically possible, fully funded and delivered before the additional demand
arises.

Attachments:

Comment

Local plan scoping consultation

Local plan evidence base

Representation ID: 6216

Received: 01/09/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

4 - Transparent and Evidence-Based Decisions
The council should publish one area-wide map and assessment covering every relevant submission
around Macclesfield. It should show the combined housing assumption, likely access arrangements
and cumulative effects on roads, schools, drainage, Green Belt, landscape and wildlife.
For every site, the council should publish both gross and net density, showing separately the land
required for ecological and landscape buffers, drainage, overhead-line easements, access, open
space and other mitigation. Where a promoter reduces the developable area, the council should
explain how that calculation has been independently checked.
Assessment criteria, evidence sources, assumptions and scoring should be published in full. Claims
made by promoters should not be treated as facts without supporting evidence.
The evidence base should compare the Greenside sites with genuine alternatives, including
brownfield regeneration, higher-density development, direct council housebuilding, council-owned
land and the safeguarded land south-west of Macclesfield. It should also show how different density
assumptions affect the amount of Green Belt that might be required.
Local evidence must be taken seriously. Residents have direct experience of school-place refusals,
school-run congestion, unsafe walking routes, unreliable bus services and surface-water flooding.
These are existing problems, not theoretical objections to future housing.

Attachments:

Comment

Local plan scoping consultation

Natural environment

Representation ID: 6217

Received: 01/09/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

5 -Protect Nature and Landscape
The land around Greenside forms a connected landscape rather than a series of isolated fields. It
includes mature hedgerows, trees, ponds and open fields linking to the Sandy Lane quarry Local
Wildlife Site. Several of the submitted sites also fall within the adopted ENV1 Ecological Network as
either core or restoration areas.
The NBN Atlas contains records from within or close to the Greenside sites for Section 41 priority
species including lapwing, brown hare and great crested newt, alongside other protected wildlife
such as barn owls. Where existing records show a realistic risk to protected or priority species,
appropriate surveys should inform site selection. They should not be left to later stages and should
be a key aspect of decision making in the early drafting of the local plan.
Assessment must consider the cumulative fragmentation of habitats and the effects of lighting,
traffic, noise, domestic pets and increased recreational pressure. Biodiversity net gain should not be
treated as permission to destroy established habitat and attempt to recreate it elsewhere. Avoiding
harm must come first.
The submitted sites around Greenside are also active agricultural land used for arable farming or
grazing. The area is historically known as “Longmoss” due to its peat content. The loss of productive
land, its contribution to food security and the role of peat in responding to climate change should
receive proper weight in a plan covering the next 15 years. As many residents have said, “once its
gone, its gone”.
Residents also have photographic evidence of regular surface-water flooding in parts of the area.
Drainage, soil and peat conditions, water quality and flood risk must be considered across site
boundaries, particularly where large areas of absorbent open land could be replaced by roads, roofs
and hard surfaces.

Attachments:

Comment

Local plan scoping consultation

Housing

Representation ID: 6218

Received: 01/09/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

6 - Build Communities, Not Just Houses
Housing numbers alone do not create a community. The plan should start with the homes Cheshire
East actually needs, particularly council and social-rented homes, accessible housing, affordable
family homes and suitable homes for older or smaller households. It should not rely mainly on large
private estates of “market housing” that we’ve seen across the county during the previous local plan
period.
More than 1,000 homes around Greenside could not sensibly be treated as several unrelated
developments. Growth anywhere near this scale would require a comprehensive masterplan
covering education, healthcare, community space, local services, public transport, recreation, green
infrastructure and safe walking and cycling routes.
These facilities must serve existing residents as well as new households and must be delivered at the
right time. The fact that children living close to Whirley Primary already miss out on places shows
that current provision is not keeping pace. The Local Plan should not add further demand on the
assumption that these problems can be solved later.

Attachments:

Comment

Local plan scoping consultation

Identifying and assessing sites

Representation ID: 7063

Received: 01/09/2026

Respondent: Keep Greenside Green Residents Group

Representation Summary:

The Keep Greenside Green Residents Group objects to site CFS26 590 progressing through the Local Plan. They argue the site continues to perform an important Green Belt function and should not be treated as Grey Belt. Concerns are raised regarding highway access, road safety, pedestrian and cycling connectivity, school capacity, ecology, landscape character, heritage impacts, landfill contamination, groundwater protection, flooding, drainage, peat, utilities, overhead power lines and foul drainage capacity. The group contends that the promoter has not provided sufficient evidence to demonstrate deliverability or support the claimed housing capacity. They request that the site is not allocated and does not progress further through the Local Plan process.

For instructions on how to use the system and make comments, please see our help guide.