Local plan scoping consultation
Search representations
Results for Mr Simon Leighton search
New searchComment
Local plan scoping consultation
Changes to Green Belt policy
Representation ID: 4561
Received: 01/09/2026
Respondent: Mr Simon Leighton
Adlington is designated Green Belt and meets the purposes of Green Belt as set out in national planning policy. Consideration of changes to Green Belt boundaries must fully recognise the role this land plays in preventing inappropriate development and protecting the character of the area.
Comment
Local plan scoping consultation
Supplementary planning documents
Representation ID: 4568
Received: 01/09/2026
Respondent: Mr Simon Leighton
Protecting environmentally sensitive areas: Areas with significant environmental value and high biodiversity, including sites identified through Cheshire Wildlife Trust (CWT) evidence, must be considered differently. The ecological importance of these areas should be fully assessed and protected.
Protecting farmland and farming : The impact on productive farmland and viable farming operations should be considered, avoiding unnecessary loss or fragmentation of agricultural land.
Considering nature recovery priorities: The Local Plan must take account of the Cheshire and Warrington Local Nature Recovery Strategy and consider any overlap between proposed development sites and areas identified as important for nature recovery.
Comment
Local plan scoping consultation
Strategic environmental assessment
Representation ID: 4569
Received: 01/09/2026
Respondent: Mr Simon Leighton
Areas with significant environmental value and high biodiversity, including sites identified through Cheshire Wildlife Trust (CWT) evidence, must be considered differently. The ecological importance of these areas should be fully assessed and protected.
Comment
Local plan scoping consultation
Connectivity
Representation ID: 4574
Received: 01/09/2026
Respondent: Mr Simon Leighton
Transport infrastructure must be realistic. The presence of a railway station alone should not be considered sufficient justification for changing Green Belt boundaries. Adlington station has an infrequent local rail service (less than two trains per hour outside of peak hours) and limited capacity for upgrades and inappropriate access on the narrow bridge. Transport evidence, including the prepared TPA (Transport Planning Associates) report, should be fully considered.
Comment
Local plan scoping consultation
Heritage, culture and natural environment
Representation ID: 4578
Received: 01/09/2026
Respondent: Mr Simon Leighton
Protecting environmentally sensitive areas: Areas with significant environmental value and high biodiversity, including sites identified through Cheshire Wildlife Trust (CWT) evidence, must be considered differently. The ecological importance of these areas should be fully assessed and protected.
Protecting farmland and farming: The impact on productive farmland and viable farming operations should be considered, avoiding unnecessary loss or fragmentation of agricultural land.
Considering nature recovery priorities: The Local Plan must take account of the Cheshire and Warrington Local Nature Recovery Strategy and consider any overlap between proposed development sites and areas identified as important for nature recovery.
Comment
Local plan scoping consultation
Green Belt
Representation ID: 4581
Received: 01/09/2026
Respondent: Mr Simon Leighton
Adlington is Green Belt, not grey belt. Adlington is designated Green Belt and meets the purposes of Green Belt as set out in national planning policy. Consideration of changes to Green Belt boundaries must fully recognise the role this land plays in preventing inappropriate development and protecting the character of the area.
Comment
Local plan scoping consultation
Spatial distribution
Representation ID: 4584
Received: 01/09/2026
Respondent: Mr Simon Leighton
It's difficult to see how housing development in Adlington would lead to affordable housing being created, when compared with current housing stock in the locality.
Comment
Local plan scoping consultation
Affordable housing
Representation ID: 4585
Received: 01/09/2026
Respondent: Mr Simon Leighton
It's hard to see how housing development in Adlington would be affordable housing when compared with existing housing stock in the locality.
Comment
Local plan scoping consultation
Transport and infrastructure
Representation ID: 4590
Received: 01/09/2026
Respondent: Mr Simon Leighton
No development should be agreed without appropriate infrastructure being in place or planned, including essential services needed (such as water supply, foul and surface drainage, power supplies such as electricity) to support existing and new communities.
Comment
Local plan scoping consultation
Transport and infrastructure
Representation ID: 4593
Received: 01/09/2026
Respondent: Mr Simon Leighton
No development should be agreed without appropriate infrastructure being in place or planned. This includes sufficient transport provision (such as public transport, highways, cycleways and footpaths) to support existing and new communities. This does not exist in or near Adlington.